KPDCL Announces Power Shutdowns Across Kashmir in January

Online Editor "Valley Vision"
Disclosure: This website may contain affiliate links, which means I may earn a commission if you click on the link and make a purchase. I only recommend products or services that I personally use and believe will add value to my readers. Your support is appreciated!


   

SRINAGAR: The Kashmir Power Distribution Corporation Limited (KPDCL) has announced a series of power shutdowns to facilitate stabilisation, maintenance, and improvement works across several areas in Kashmir. The details of the scheduled interruptions are as follows:

Amargarh-Arampora Line

To undertake twining and stabilisation of the 33KV Amargarh-Arampora line, power supply to Receiving Stations at Arampora, Panzipora, and Sher Colony will remain disrupted. Consequently, areas including Panzipora, Arampora, Sher Colony, and adjoining localities will experience outages from 9:30 AM to 3:30 PM on January 11, 15, 18, and 21, 2025.

Magam-Kongamdara Line

Maintenance work on the 33KV Magam-Kongamdara line will result in power interruptions at the 33/11KV Receiving Stations in Kunzar and Dobhiwan. Power supply to Kunzar, Kralweth, Lalpora, Chichilora, Hard Aboora, and Dhobiwan will be affected on January 11, 2025, from 9:30 AM to 3:30 PM.

Alasteng-Nagbal Line

Stabilisation and maintenance of the 33KV Alasteng-Nagbal line will necessitate a power shutdown, impacting Receiving Stations at Alasteng, Nagbal, Gadoora, and Tulbagh. Power supply to Shuhama, Bakura, Darend, Nagbal, Fatehpora, Check, Gadoora, Tulbagh, and Chundina will be disrupted on January 11, 2025, from 10:00 AM to 3:00 PM.

Shariefabad-Narbal Line

Stabilisation work on the 33KV Shariefabad-Narbal line will lead to outages at Receiving Stations in Narbal and Sanoor. The power supply to Narbal, Mazhama, Sanoor, Malpora, Kawoosa, Sozeith, Radbugh, and Lawaypora will be affected on January 9 and 11, 2025, from 11:00 AM to 4:00 PM.

Shariefabad-Wadwan Line

For the 33KV Shariefabad-Wadwan line, shutdowns will impact Receiving Stations at Shariefabad, Soibugh, and Wadwan. Soibugh, Daharmuna, Wadwan, Russu, Prmus, Shariefabad, and Durbal areas will face power outages on January 13, 2025, from 11:00 AM to 4:00 PM.

Delina-Wagoora Line

To complete the 33KV Kalantra Tap line works, the 33KV Delina-Wagoora line will be shut down. Receiving Stations at Sangrama, Wagoora, Kreeri, and Ichloo will be affected, disrupting power supply to Sangrama, Kreeri, Nowpora, and adjoining areas on January 11 and 13, 2025, from 10:30 AM to 4:30 PM.

Residents in the affected areas are advised to plan accordingly and cooperate with the KPDCL to ensure smooth execution of these essential works.

 



Visit: Valley Vision News

Share This Article
Valley Vision News is your trusted source for authentic and unbiased news from the heart of Kashmir and beyond. We cover breaking news, culture, politics, and stories that matter, connecting local voices to global perspectives. Stay informed with us! "Empower your vision with truth, for every story has the power to change the world."
Leave a Comment

Leave a Reply

Your email address will not be published. Required fields are marked *